The joists are all in and the deck has gone down. The deck is a tongue and grooved chipboard with water resistant surface. The boards are bonded edge on edge and bonded to the joists below to ensure the whole floor stays good and secure.
The whole in the deck is where the stairs come up. Let's hope the timber work around the edge is temporary!
Today 22/06 the guys have started with the first floor walls! Here looking to the north western corner of the first floor.
No comments:
Post a Comment